Under Construction

Water Treatment Plant Pole Barn Enclosure (W1514)


Project Status: Under Construction
Project Value: $290,169.10
Anticipated Completion Date: September 15, 2017
 
Structural improvements to the pole barn at the Water Treatment Plant which was previously used to store dried lime sludge.
Contact: Amanda Barnes, Assistant Director of Utilities, email or call 561-741-2537

Alternate

A1A/

Damon

Bridge Water Transmission Main Replacement and Force Main Installation (W1611A)


Project Status: Under Construction 
Project Value: $1,051,736
 
Description: The existing 20" diameter steel transmission watermain located on the west side of the Alternate A1A Bridge (aka Damon Bridge) constructed in 1976 is being replaced with a new 12" diameter steel pipe. In addition, a new 16" sanitary forcemain for the Loxahatchee River District (LRD) will be constructed on the west side of the bridge with the watermain.

Contact: Steven Montemayor, Utilities Engineer, email or call 561-741-2710 
Alt A1A_Damon Bridge Water Transmission Main Replacement and Force Main Installation (W1611A)
 

Southern Transmission Main Crossing of I-95 and the Turnpike at Donald Ross Road (W1607)


Project Status: Under Construction
Project Value: $686,434
 
Description: Construction of a new 10" watermain between the Heights of Jupiter at Eberts Street and Marrian Avenue and Palm Beach Country Estates at 64th Way N. Construction under I-95 and Florida's Turnpike will be by horizontal directional drill (HDD). A flow and pressure monitoring station will be installed on the Town's property at the west end of Eberts Street.  

Contact: Steven Montemayor, Utilities Engineer, email or call 561-741-2710

Elsa & Paulina Roads Drainage and Watermain Improvements (W/S1710)


Project Status: Under Construction
Project Value: $362,142.00

Description: Construction of a drainage system to relieve significant and routine street flooding on Elsa and Paulina Roads. Drainage improvements include installation of 18" and 24" reinforced concrete pipe, drainage structure, valley gutters along edge of pavement, a vortex structure for enhanced treatment of storm water runoff prior to discharges to the Intracoastal Waterway, and infrastructure for a future pumping station to alleviate flooding caused by future sea level rise. Improvements to the existing watermains to enhance water quality and provide fire protection to current level of service standards.

Contact: Brad Wagner, Senior Utility Engineer, email or call 561-741-2589

Well Rehabilitation Program (W1614)


Project Status: Ongoing Project - Under Construction

Description: Well rehabilitation services for the Town's Floridan and Surficial Aquifer water supply wells. Work under this contract may include both emergency and non-emergency well rehabilitation services and repairs. 
 
Rehabilitation of Floridan Aquifer RO-9 located in the C-18 Canal Right of Way, west of the Florida Turnpike
Anticipated Start Date: September 11, 2017
Anticipated End Date: November 20, 2017

Contact: Rebecca Wilder, Assistant Facilities Manager, email or call 561-741-2635


Point Lane East Watermain Extension (W1704B)


Project Status: Under Construction
Project Value: $49,550

Description: Construction of approximately 680 LF of 8" C-900 PVC watermain from Pennock Point Road west to tie in to an existing 8" gate valve.

Utilities Painting Maintenance (W1604)


Project Status: Ongoing Project - Under Construction

Description: Painting of various water and stormwater utility facilities, including but not limited to, concrete ground storage tanks, interior and exterior of concrete block structures, and pipe, pumps, motors, and hydrants and other facilities.
 
Contact: Brad Wagner, Senior Utility Engineer, email or call 561-741-2589